Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework, see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.
# with the Vercel skills CLI npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-schedule # as a Claude Code plugin /plugin marketplace add jgsystemsconsulting/jgs-se-knowledge-packs /plugin install jgs-se-knowledge-packs@jgs-se-knowledge-packs # or clone and install the whole catalogue python install.py
GAO-16-89G (December 2015)