Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/risk in depth (see the GAO Schedule Assessment Guide), agency-specific cost models, or the full text of referenced standards (EIA-748, MIL-STD-881D, the Green Book), these are named, not reproduced.
# with the Vercel skills CLI npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost # as a Claude Code plugin /plugin marketplace add jgsystemsconsulting/jgs-se-knowledge-packs /plugin install jgs-se-knowledge-packs@jgs-se-knowledge-packs # or clone and install the whole catalogue python install.py
GAO-20-195G (March 2020)